Previous Tenders

Tender Type
Starting Date of Downloading & Time
Ending Date of Download Date & Time
Name of the Work
Last Date & Time for Submission of Bids
Technical Bid opening
Price Bid opening
'e'
28-10-2009 5.00PM
13-11-2009 3.00PM
Construction of Masonry Central Median from Charminar to Falaknuma Download Pdf
13-11-2009 3.30PM
After 4.00PM of 13-11-2009
After 4.00PM of 17-11-2009
'e'
22-10-2009 3.00PM
30 -10-2009 3.00PM

Formation of Road with HMP at Various Stretches on Himayath Nagar Main Rooad From Liberty Junction to Narayanaguda Junction Download Pdf

30-10-2009 3.30PM
After 4.00PM of 30-10-2009
After 4.00PM of 30-10-2009
'e'
14 -10-2009 3.00PM
31-10-2009 3.00PM

1.Investigation, Surveying, Design, Preparation of Detailed Estimates and Execution of 1. Construction of Road from Malaysian Township Junction to Moosapet connecting to Anjanaya Nagar under Engineering Procurement and Construction (EPC) System and

2. Construction of 150'-0" and 100'-0"wide BT road from N.H.9 connecting to Chandha Nagar MMTS Railway Station as per RDP under Engineering Procurement and Construction (EPC) System Download Pdf

31-10-2009 3.30PM
After 4.00PM of 31 -10-2009
After 4.00PM of 04-11-2009
'e'
09-10-2009 3.00PM
28-10-2009 3.00PM
Investigation, Surveying, Design, Preparation of Detailed Estimates and Construction of 80'.0" wide BT road from Amaravathi Hotel (Madhapur Main Road) to Moosapet - Malaysian Township Road (From Ch.1.20 km to 3.60 km) as per RDP under Engineering Procurement and Construction (EPC) System Download Pdf
28-10-2009 3.30PM
After 4.00PM of 28-10-2009
After 4.00PM of 31-10-2009
G
09-10-2009 3.00PM
27-10-2009 3.00PM
Laying of CC road on to be widened portions from Lakadikapool to Erragadda Flyover Download Pdf
27-10-2009 3.30PM
After 4.00PM of 27-10-2009
After 4.00PM of 30-10-2009
G
13-10-2009 4.00PM
21-10-2009 up to 12.00 noon
 Short Tender for Procurement of New Cartridges Download Pdf
21-10-2009 up to 3.00 P.M

21-10-2009 up to 3.30 P.M
21-10-2009 up to 4.00 P.M
'e'
22-09-2009 after 3:00 PM
13-10-2009 after 3:00 PM
Providing Central lighting system with 12 Mtrs. MS tubular poles from Serilingampally X road to Nakkavagu bridge (Patancheruvu) Download Pdf
13-10-09 up to 3.30 PM.
After 4.00PM dt. 13-10-2009
On or After 16-10-09 at 4.00 PM
G
17.07.2009
03.08.2009 by 3.00 P.M.
Consultancy Services for Preparation of concept plan and detailed project report, designs and plans with green building concept, project management and quality control for construction of council hall cum office complex at ghmc land.Download Pdf
03.08.2009 by 4.00 P.M.
03.08.2009 by 4.00 P.M.
03.08.2009 by 4.00 P.M.
'e'
10-08-2009 3:00 PM
27-08-2009 up to 3.00 PM
Providing New Electric Crematorium at Sanjeeva Reddy Nagar,Banjara Hills,Bansilalpet and Amberpet including all accessories including Operation & Maintenance for 3 years,..  Download Pdf 
27-08-2009 up to 3.00 PM
After 4.00PM on 27-08-2009
On or After 31-08-2009 at 4.00 PM
G
06-08-2009 3.00 PM
17-08-2009 after 3.00 PM
Construction of incomplete compound wall around proposed shopping complex at Government to Chest hospital Kalyannagar(Erragadda) Download Pdf 
17-08-2009 after 3.30 PM
20-08-2009 after 4.00 PM
20-08-2009 after 4.00 PM
'e'
27-07-2009 3.00PM
13-08-2009 3.00PM
Road Widening works to a total width of 80’ to the road behind Ambedkar University to Kavuri Hills, Madhapur to Durgam Cheruvu Road via Vasanth Vihar, Madhapur as per RDP. Download Pdf 
13-08-2009 3.30PM
After 4.00PM of 13-08-2009
After 4.00PM of 17-08-2009
'e'
23-07-2009 3.00PM
10-08-2009 3.00PM
Investigation, Surveying, Design, Preparation of Detailed Estimates and Execution of Road widening works from Moosapet Cheruvu Connecting to Railway Line via IDL as per approved as per approved RDP under Engineering Procurement and Construction (EPC) System Download Pdf 
10-08-2009 3.30PM
After 4.00PM of 10-08-2009
After 4.00PM of 13-08-2009
'e'
18-07-2009 5.00PM
04-08-2009 3.00PM
Investigation, Surveying, Design, Preparation of Detailed Estimates and Execution of Construction of 80’ 0” wide road for a length of 2600 mtrs. And 60’ 0” wide road for a length of 800mtrs. From DARGAH JUNCTION to O.U. COLONY IN SERILINGAMPALLY (South) as per approved RDP under Engineering Procurement and Construction (EPC) System  Download Pdf 
04-08-2009 3.30PM
After 4.00PM of 04-08-2009
After 4.00PM of 07-08-2009
G
17-07-2009 5.00PM
19-08-2009 11.00AM
Consultancy Services for Preparation of concept plan and detailed project report, designs and plans with green building concept, project management and quality control for construction of council hall cum office complex at GHMC land in lower tank bund road. Download Pdf  and Amendment   &   Addendum
19-08-2009 11.00AM
After 11.00AM of 19-08-2009
After 11.00AM of 19-08-2009
'e'
10-08-2009 3:00 PM
27-08-2009 up to 3.00 PM
Providing New Electric Crematorium at Sanjeeva Reddy Nagar,Banjara Hills,Bansilalpet and Amberpet including all accessories including Operation & Maintenance for 3 years,..  Download Pdf 
27-08-2009 up to 3.00 PM
After 4.00PM on 27-08-2009
On or After 31-08-2009 at 4.00 PM
G
06-08-2009 3.00 PM
17-08-2009 after 3.00 PM
Construction of incomplete compound wall around proposed shopping complex at Government to Chest hospital Kalyannagar(Erragadda) Download Pdf 
17-08-2009 after 3.30 PM
20-08-2009 after 4.00 PM
20-08-2009 after 4.00 PM
'e'
27-07-2009 3.00PM
13-08-2009 3.00PM
Road Widening works to a total width of 80’ to the road behind Ambedkar University to Kavuri Hills, Madhapur to Durgam Cheruvu Road via Vasanth Vihar, Madhapur as per RDP. Download Pdf 
13-08-2009 3.30PM
After 4.00PM of 13-08-2009
After 4.00PM of 17-08-2009
'e'
23-07-2009 3.00PM
10-08-2009 3.00PM
Investigation, Surveying, Design, Preparation of Detailed Estimates and Execution of Road widening works from Moosapet Cheruvu Connecting to Railway Line via IDL as per approved as per approved RDP under Engineering Procurement and Construction (EPC) System Download Pdf 
10-08-2009 3.30PM
After 4.00PM of 10-08-2009
After 4.00PM of 13-08-2009
'e'
18-07-2009 5.00PM
04-08-2009 3.00PM
Investigation, Surveying, Design, Preparation of Detailed Estimates and Execution of Construction of 80’ 0” wide road for a length of 2600 mtrs. And 60’ 0” wide road for a length of 800mtrs. From DARGAH JUNCTION to O.U. COLONY IN SERILINGAMPALLY (South) as per approved RDP under Engineering Procurement and Construction (EPC) System  Download Pdf 
04-08-2009 3.30PM
After 4.00PM of 04-08-2009
After 4.00PM of 07-08-2009
G
17-07-2009 5.00PM
19-08-2009 11.00AM
Consultancy Services for Preparation of concept plan and detailed project report, designs and plans with green building concept, project management and quality control for construction of council hall cum office complex at GHMC land in lower tank bund road. Download Pdf  and Amendment   &   Addendum
19-08-2009 11.00AM
After 11.00AM of 19-08-2009
After 11.00AM of 19-08-2009
G
19-08-2009 3:00 PM
28-08-2009 3:00 PM
Sealed quotations are invited to offer their rates separately from the eligible Agencies for the work of Annual maintenance of EPBX Systems at GHMC Head Office,..   Amendment
28-08-2009 3:30 PM
After 4.00PM of 28-08-2009
After 4.00PM of 29-08-2009
G
14-09-2009
06-10-2009 up to 3.00 P.M
Procurement of Equipment and Medicines required establishing the operation theatre at Dog Pound, Chudi Bazar. Download Pdf
07-10-2009 3.00 PM
07-10-2009 4.00PM
07-10-2009 4.00PM
G
06-10 -2009 up to 4.00PM
13-10 -2009 upto 12.00 Noon
Short Tender for Procurement of Kaspersky Antivirus Software & Anti Spam for Mail Server Download Pdf   Amendment
13-10 -2009 upto 3-00 pm
13-10 -2009 upto 03.30 PM
13-10 -2009 upto 4.00 PM
G
25-09-2009 up to 12.00 noon
07-10-2009 up to 12.00 noon
IT Section – Inviting of Tenders from authorized Netasq F200 UTM Partners for Renewal of Netasp f200 UTM/firewall, Firmware & Intrusion “Prevention system” on yearly basis Download Pdf
07-10-2009 up to 3.00 P.M
07-10-2009 up to 3.30 P.M
07-10-2009 up to 4.00 P.M

     Note: 'e' -'e'-Procurement, G-General.    

Copyright © 2010 GHMC (IT Department). All rights reserved. (Best viewed with IE Ver 6.0 and above with a resolution of 1024x768.)